I am in the process of welding a new shop for myself. It is going to have a pipe frame and metal sides but the front facing the road I am putting limestone to match my house about three foot up for looks only. I know the metal will come all the way down to the slab but how is the stone done then. Is there any type of moisture barrier to keep metal from rusting behing bricks? How is the to ledge done? Is there a trim kit they make for this? I know I have seen buildings like this does anyone have experience in this?
Thanks