2 steps forward 1 step back.The Devcon that I originally used did not cure properly so I removed it and used JB Weld instead.It cured perfectly.After it dried I continued on.
1.Pre drilled the 1/2" dowels with a 1/8" drill bit and cut the dowels to size.The lower one will contact the sling swivel so I had to shorten it a bit.
2.I measured the center line in the butt stock and drew a line.Then,I drilled 2 holes with a 1/2" drill bit for the dowels.
3.I mixed up the JB Weld,rolled the dowels in it,put some in the holes,and installed the dowels.I cleaned out the pre drilled holes for later.
4.Covered it all with JB Weld and it is now drying.
Recoil pad will be here tomorrow.
1.Pre drilled the 1/2" dowels with a 1/8" drill bit and cut the dowels to size.The lower one will contact the sling swivel so I had to shorten it a bit.
2.I measured the center line in the butt stock and drew a line.Then,I drilled 2 holes with a 1/2" drill bit for the dowels.
3.I mixed up the JB Weld,rolled the dowels in it,put some in the holes,and installed the dowels.I cleaned out the pre drilled holes for later.
4.Covered it all with JB Weld and it is now drying.
Recoil pad will be here tomorrow.