We have an aerobic septic system so I have to add tabs about once a month. Is there an alternative to this 6’ thick concrete lid? I’ve been leaning over and lifting it out for 15 years but the older I get, the heavier it gets.
Is a lid of that type likely a code requirement?


Comment