Good looking man!
X
-
Wired in the AC this morning, pressure tested the line sets, pulled vacuum on them and released the cold stuff. Fired right up and it sure is nice to be working in a climate controlled cabin now!!
Started wrapping up the home runs to breaker box, just need to pick up the rest of the breakers.
Got one more wall finished in the living area, 3 more to go and the vaulted ceiling and that finish the T&G
Sent from my iPhone using Tapatalk Pro
Comment
-
Originally posted by Hix View PostKnocked out both vaulted walls today.. one wall left and the ceiling. Hopefully have all that done this week, that ceiling is going to be tough by myself.
Killed 196# last night with my 6.8 & thermal and got to enjoy the night view.
Sent from my iPhone using Tapatalk Pro
If your wife or anybody else is available, let them use a long extension roller pole with a rubber chair foot on the end. I installed over 3000sf like that. My wife never complained cause she wanted beadboard.
Or work from the center of your board out, itlll pretty much hold itself.
Good luck and your place looks awesome.
Sent from my iPhone using Tapatalk Pro
Comment
-
Originally posted by Buckshot4900 View PostIf your wife or anybody else is available, let them use a long extension roller pole with a rubber chair foot on the end. I installed over 3000sf like that. My wife never complained cause she wanted beadboard.
Or work from the center of your board out, itlll pretty much hold itself.
Good luck and your place looks awesome.
Sent from my iPhone using Tapatalk Pro
I have some little helpers i made. Basically two 10” pieces with a small pieces sandwiched in one end. Slip it over the boards to the next one and it holds it for you while you get the tongue and groove seated.
Sent from my iPhone using Tapatalk Pro
Comment
Comment