I spent Memorial weekend getting working on the cabin. Andy and his son joined my Son and I on Saturday morning. We started out getting the rest of the cabin's exterior plywood installed on the front and East side of the Cabin. (Pic 1 & 2) We then Tyvecked those walls and installed the windows.
On Sunday we weather proofed the windows and and began getting all of the trim done around the Windows and capped the R-panel to prepare for installing the cedar siding. Sunday Afternoon my wife came down for lunch with her Mother and father as they haven't seen the place yet. My son and Andy's son decided to go home that afternoon with my wife, because the weather radar looked like a major thunderstorm would hit in the late afternoon. As it turned out the storm dissipated before reaching us. It did cool things done quite a bit and gave us a spectacular sunset, followed by clear star filled skies for the evening. (Pic 3)
Monday Andy I installed as much siding as we could get on. From 7:30 AM until 2:45 we worked nonstop. I think it turned out great. There will be 3 more windows cut in above the porch roof-line but those are filled in right now. (pics 4-9)
On Sunday we weather proofed the windows and and began getting all of the trim done around the Windows and capped the R-panel to prepare for installing the cedar siding. Sunday Afternoon my wife came down for lunch with her Mother and father as they haven't seen the place yet. My son and Andy's son decided to go home that afternoon with my wife, because the weather radar looked like a major thunderstorm would hit in the late afternoon. As it turned out the storm dissipated before reaching us. It did cool things done quite a bit and gave us a spectacular sunset, followed by clear star filled skies for the evening. (Pic 3)
Monday Andy I installed as much siding as we could get on. From 7:30 AM until 2:45 we worked nonstop. I think it turned out great. There will be 3 more windows cut in above the porch roof-line but those are filled in right now. (pics 4-9)
Comment