I have several sections of rr track along with a 5gallon bucket full of new rail spikes. I use two 10ft pieces pulled behind a tractor for a drag harrow to smooth things out after dozing or disking. Also currently have some on a stack of oak lumber I am drying for weight.
I have several sections of rr track along with a 5gallon bucket full of new rail spikes. I use two 10ft pieces pulled behind a tractor for a drag harrow to smooth things out after dozing or disking. Also currently have some on a stack of oak lumber I am drying for weight.
I have 2 10’ sections. I’m gonna use one as a drag behind the tractor, I’m guessing it will be heavy enough?
Comment