Announcement

Collapse
No announcement yet.

Standing up a drill stem flag pole

Collapse
X
 
  • Filter
  • Time
  • Show
Clear All
new posts

    #16
    I helped someone do something similar. We used a post hole digger to dig a hole and installed a piece of PVC slightly larger than the pipe in the hole.

    To raise the pipe, we tied four ropes about 2/3 of the way up the pole. The 2 ropes in the front spread out at about 30 degrees and each rope had a couple of guys pulling the pipe up and the 2 ropes in the back were spread out and had a guy each to steer and to keep the pole from going past vertical.

    Comment

    Working...
    X