I’ll try to update this post as I go. Adding a small shop to put my welding stuff in. I didn’t have much room left on my lots so I had to go 24x30x12. Has a 3x3 slab on the back end to house my air compressor. Will have a 10x10 roll up, one walk through, and two windows. I will have this building and the 24x24 in the background to work out of. I do some welding projects for folks on my days off as I have time.
Started with some good base material.
Slab is poured. Had a little Landing/ramp poured in front of the roll up door.
Bolt up building from Muellers was delivered yesterday.
I’ll try and update as I go. Going to be another week to ten days before the steel starts going up.
Sent from my iPhone using Tapatalk
Started with some good base material.
Slab is poured. Had a little Landing/ramp poured in front of the roll up door.
Bolt up building from Muellers was delivered yesterday.
I’ll try and update as I go. Going to be another week to ten days before the steel starts going up.
Sent from my iPhone using Tapatalk