Hey guys, I am getting old and my back has said no to finishing this project.
2x Daikin ceiling cassettes to offset sun facing rooms.
I have poured slab and set compressor, installed both Daikin FFQ cassettes, and run the thermostat wires/installed thermostats.
What is left:
1. Run both line sets
2. Plumb both drains *10 ft each to eves
3. Electric tie in
4. Start up
I have all parts here including extra gas if needed.
If you have this skill set and need some cash money come give me a price. I know how to do it and can't stand to farm this out but after the cassette installs I am fully aware that my back will not let me finish in my wife's timeline.
Sent from my SM-G975U using Tapatalk
2x Daikin ceiling cassettes to offset sun facing rooms.
I have poured slab and set compressor, installed both Daikin FFQ cassettes, and run the thermostat wires/installed thermostats.
What is left:
1. Run both line sets
2. Plumb both drains *10 ft each to eves
3. Electric tie in
4. Start up
I have all parts here including extra gas if needed.
If you have this skill set and need some cash money come give me a price. I know how to do it and can't stand to farm this out but after the cassette installs I am fully aware that my back will not let me finish in my wife's timeline.
Sent from my SM-G975U using Tapatalk