We are in week three living at the Marriott
All the plumbing is fixed and most of the drywall and ceiling is back together but the entire downstairs is down to cement floors. Decided to go ahead and scrap our master bath while we were at it and I’m glad we did, had some leaks under the tub and in both the shower and bath drains. We are at least 4 more weeks from moving back in.
Sent from my iPhone using Tapatalk Pro
All the plumbing is fixed and most of the drywall and ceiling is back together but the entire downstairs is down to cement floors. Decided to go ahead and scrap our master bath while we were at it and I’m glad we did, had some leaks under the tub and in both the shower and bath drains. We are at least 4 more weeks from moving back in.
Sent from my iPhone using Tapatalk Pro
Comment