Any Milam County road builders?
It's 3x5 with gravel and limestone base over the top. the water is actually flowing thru the big rock underneath. They dug down roughly 3 feet into the clay. There are 4 loads of 3x5 rock on top of the broken up bridge.
Originally posted by Dusty Britches
View Post
It's 3x5 with gravel and limestone base over the top. the water is actually flowing thru the big rock underneath. They dug down roughly 3 feet into the clay. There are 4 loads of 3x5 rock on top of the broken up bridge.
Comment