    Originally posted by tps7742 View Post
    Now putting the beams in now for the loft was an excellent idea!


    I mentioned to Shawn that I was going to put in a loft and he suggested I have Donny put in the beams now. I called Donny and we worked it out.


    Sent from my iPhone using Tapatalk

    Comment


      #62
      Originally posted by Wil Taylor View Post
      Lip, who are you using. I have a house on Lake Murvaul and thinking about buying my in laws place next to me. If I do I want to pull out there old trailer and build a shop like yours.


      Donny Fountain out of Center. Foundation by Shawn Danley. Get with Donny before buying a kit. He can build a welded building for close to the same price. TPS742 used him as well.


      Sent from my iPhone using Tapatalk

      Comment


        #63
        Steel Building Questions - Getting Ready to Build

        Weather slowed them down for a few days but the walls are up.



        Comment


          #64
          Looking good Lip. It should be Randy for equipment in the near future.

          Comment


            #65
            Originally posted by tps7742 View Post
            Looking good Lip. It should be ready for equipment in the near future.


            They put the roof on this morning. If the weather holds out, they'll finish the trim and gutters today and should install the doors tomorrow.


            Sent from my iPhone using Tapatalk

            Comment


              #66
              Looking good, gonna be nice!

              Comment


                #67
                The building itself was completed today. Still need electrical, restroom, plumbing, loft floor, stairs...

                Trail cam pics are all I have for now:

                Click image for larger version

Name:	File Feb 28, 8 18 52 PM.jpeg
Views:	1
Size:	206.6 KB
ID:	24486365

                Click image for larger version

Name:	File Feb 28, 8 18 36 PM.jpeg
Views:	1
Size:	272.4 KB
ID:	24486366

                Click image for larger version

Name:	File Feb 28, 8 19 20 PM.jpeg
Views:	1
Size:	265.2 KB
ID:	24486367

                Comment


                  #68
                  Man, I could almost live in something like that!

                  Is it for rent?



                  j/k Looking good brother!

                  Comment


                    #69
                    Any updates? The good or bad with what you did, like to see more recent pictures too.

                    I am about to pull the trigger on a 30X50 weld up in the Caldwell area on our recent 25 acre purchase. Putting lean to on both ends @ 12', concrete on one side, two doors in middle, splitting into shop and man cave. right at 28/sq foot which is 3 rollups and insulated and plummet for bathroom.

                    Comment


                      #70
                      I haven't had a chance to build out the restroom or the loft inside the building or add electrical but hopefully will get that done sometime in the next 6 months. I have the drains for a commode and sink. The wife wishes it had a shower so when the grands are playing in the mud kitchen they would have a place to shower before coming into the house. I'm not sure if it would get much use but I would probably plumb it for one if I had it to do over. I like where my three doors are. I can drive through the one on the right side of the. Holding and out the back into the field. Now that the fence is up, the front side is in the yard, back side is in the field. Pouring the full slab across the front instead of runners at each door was a good idea. I'd go ahead and pour it end to end next time instead of stopping a few feet after the door. Of course if it isn't going to be integral with your back yard, having this much concrete in front of the building isn't a big deal. I added the beams on one end for a loft, I haven't built it and don't need it yet but I would consider beans for a loft in the middle if I needed more storage space. Adding them with the build is cheaper and easier than adding after the build. I'll see what pictures I have or take some this weekend but the building itself is finished in these pictures.




                      Sent from my iPhone using Tapatalk

                      Comment


                        #71
                        Nice doing business with you yesterday Lip. Thanks for showing me around the improvements you have made to your shop, very nice. You have a beautiful place and it shows you both work on it.

                        Comment


                          #72
                          Glad you came out to the place so I could show you around. Still a lot of work to do but it’s coming along.

                          Bonner Electric is the company and they are out of Jacksonville. I highly recommend them if they’ll make the drive to your place whenever you’re ready.

                          Comment


                            #73
                            Thanks for the information.

                            Comment


                              #74
                              It's been a while since I updated so thought I'd share a few pics. Loft is pretty well finished, electricity is in. Plumbing is in. We decided to build a bunk room under the loft so working on that as well as finishing the bathroom. Since we're putting in a bunk room, we decided to add a shower.

                              Click image for larger version

Name:	2019-05-05 12.30.39.jpg
Views:	1
Size:	346.0 KB
ID:	24612707

                              Click image for larger version

Name:	2019-06-13 16.23.06.jpg
Views:	1
Size:	316.5 KB
ID:	24612708

                              Click image for larger version

Name:	2019-06-13 16.21.35.jpg
Views:	1
Size:	350.9 KB
ID:	24612709

                              Click image for larger version

Name:	2020-03-15 12.10.10.jpg
Views:	1
Size:	267.5 KB
ID:	24612710

                              Comment


                                #75
                                Looking good Lip. Congratulations on the progress y’all have made.

                                Comment

                                Working...
                                X