I have a creek that has washed out going to one of my stands and have made low water crossings each year but they continue to wash out. I am looking at making a 20' bridge out of some 26' guard rails for my ranger and small tractor to cross. I wanted to see if anyone on the green screen has done this before and has some tips? thanks!
X
-
Did you undercut the creek bottom and put large rock ( rip-rap size ) in the bottom and finish to grade with smaller rock ? I have three low water crossings that have been through some pretty good floods and the most they ever do is mud up a little when the water starts down. Last big rain we had here, the creek got out of the banks but the crossings are still intact. Cheaper and much easier than a bridge most of the time. I know a good contractor at Moscow that could help you if needed.
-
Originally posted by aggie11 View PostThat was the original crossing was and I redid it 2 years ago but the creek has continued to wash deeper and deeper working its way up stream and it finally got to my crossing and washed it out. i think my best option is to build over it to keep it from happening again
Comment
Comment