Two part test....9.5 hours...one LONG day...ugh.
I need to qualify for the company's "Florida Mechanical License" and since we set/install rotating equipment (pumps and such, we're a heavy industrial contractor), a small piece of our work falls under that jurisdiction. Trouble is the Mechanical test is 90% HVAC stuff which we sub out rather than self perform. I'm real tired of looking at psychometric charts, sensible heat ratios, fan friction loads, which support spacing for rigid duct, occupant heat gain, etc.
I think I'd rather have paper cuts on my corneas.
Ah well, at least it'll be 77 in Kissimmee this week.
I need to qualify for the company's "Florida Mechanical License" and since we set/install rotating equipment (pumps and such, we're a heavy industrial contractor), a small piece of our work falls under that jurisdiction. Trouble is the Mechanical test is 90% HVAC stuff which we sub out rather than self perform. I'm real tired of looking at psychometric charts, sensible heat ratios, fan friction loads, which support spacing for rigid duct, occupant heat gain, etc.
I think I'd rather have paper cuts on my corneas.
Ah well, at least it'll be 77 in Kissimmee this week.

Comment