I am attempting to install a Kasa smart switch at the end of run box. I have a hot, black, neutral, white, and a ground coming into the box. The switch has two blacks, a white, and ground. What do I do with the second black? Live or load doesn't matter according to documentation.
Announcement
Collapse
No announcement yet.
Electrical question
Collapse
This topic is closed.
X
X
Comment